2008 : Namibia
Team Leader : Update of the Master Plans for a 70.000 inhabitant town
in Northern Namibia Funding : Ministry of Foreign Affairs of
Luxemburg
2008 : Mali
Database
and Water resources expert : Expertise for the update and extension of
the SIGMA database (water and sanitation infrastructures nationwide)
and integration of water resources monitoring system Funding :
Danish Co-operation
2008 : Romania
GIS
Expert : Support to the development of monitoring systems for water and
sewerage networks in the County of Botosani Funding : European
Union
2007-2008 : Mali
Team
Leader : Drafting of a methodology and field validation for the
systematic identification and characterization of grazing areas and
water points; database and GIS to produce thematic maps (260.000
km² area). Funding : Ministry of Foreign Affairs of Luxemburg
2007 : Mali
Hydraulics
and Civil Works Engineer : Formulation of the water supply component of
a multi-sector project in North Mali. Funding : Luxembourg
Co-operation
2007 : ACP-EU
Evaluator
- Database expert : Evaluation and review of the process of calls for
proposals. 300 proposals, 85 countries. Funding : EU
2007 : Chad
GIS
Expert : Drafting of a database and GIS for the programming and
monitoring of investments by all the donors in the rural sector.
Funding : French Co-operation
2007 : Burundi
Team
leader : Update and finalization of the projects’ Master Plan for
the installation of 75 boreholes and 125 spring catchments in 3
provinces of the country. Stakeholders’ coordination.
Funding : Belgian Co-operation
2007 : Namibia
Team
leader : Final evaluation of a project aiming at the construction of
new infrastructures and beneficiaries’ awareness programmes (130
boreholes, 120 waterpoints, 100 water committees, 18 dams).
Funding : Lux-Development
2006 : Namibia
Team
leader : Final evaluation of a project aiming at the construction of
new infrastructures and beneficiaries awareness programmes, for a
65,000 inhabitants town Funding : Lux-Development
2006 : Turkey
Engineer : Drafting of the technical offer of the Consulting Agency Funding : E.B.I.
2006 : Yemen
Team
Leader : Identification of the needs and development of a monitoring
and evaluation software for the activities of an irrigation improvement
project.
Including GIS.
Extension to the irrigation in the whole country. Funding : World Bank
2005-2006 : Chad
Team Leader : Technical assistance to the Ministry of
Environment and Water for the starting procedure of the 9th EDF –
Water supply (50 M EUR). Funding : European Union
2005-2006 : Madagascar
Computer expert : Finalization and tests for a software allowing the development projects monitoring, indicators.
2005 : Congo (DR)
Monitoring & Evaluation Expert : Project (MODRU)
aiming at the rehabilitation of urban infrastructures (30 M USD) :
roads, scholls, health centers, water and electricity. Definition
of the impact measurement procedures during the tendering, procurement
and execution process.
2005 : Tajikistan
Infrastructures Expert : Technical audit of the
infrastructures, costs evaluation, accuracy of the intervention.
Infrastructures project : schools, health centers, water supply,
electrification. Funding : World Bank
2005 : Mali
Project Manager : Improvement of the monitoring
principles in the logical framework and the indicators, in
collaboration with the components managers. National Programme for
Rural Infrastructures (water supply, roads, agriculture, etc.).
Funding : World Bank
2005 : DR Congo
Evaluation Expert : Project (MODRU) aiming at the
reconstruction of urban infrastructures. Definition of the impact
measurement procedures during the tendering, procurement and execution
process. Funding : World Bank
2004-2005 : Rwanda
Software Engineer : Project aiming at the development
of agricultural activities generating incomes and of quality for export
to high added value markets (coffee, tea, fruits).
Determination of the base situation, "before project".
Drafting of a database for the follow of impact and result indicators. Funding : IFAD
2004-2005 : Rwanda
Software Engineer : Drafting of a database centralising
all the existing data about water resources in Rwanda : sources,
catchments, drillings, hydrogeology, hydromertry, catchment areas,
etc…
Link to a GIS. Funding : World Bank
2004 : Senegal
Infrastructures and Software Engineer : Final study of 32 water supply networks in the regions of Diourbel, Fatick and Kaolack.
Development of a methodology for the quick and reliable
identification of the network's characteristics, automatisation of the
technical needs (calculations, reporting, etc.).
GIS of the interventions. Funding : Belgian Co-operation
2004 : Estonia
Project Manager : Identification of the needed
improvement in order to reach the EU-norms and regulations. Water
supply and sewerage networks modelling, development management
programme, prior interventions, on short and long terms. Funding :
AWEx
2004 : Mali
Project Manager, Databases Engineer : Identification of
the monitoring principles in the logical framework, definition and
development of the indicators, in collaboration with the components
managers.
Development of a database for the monitoring and evaluation of the project's indicators. Funding : World Bank
2004 : Romania
Hydraulics and Software Engineer : Identification of
the needed improvement in order to reach the EU-norms and regulations.
Water supply and sewerage networks modelling, development management
programme, prior interventions, on short and long terms.
Development of a GIS. Funding : European Union
2003-2004 : Bolivia
Software Engineer : Study of the Tolomosa River
characteristics : erosion level, assessment of the hydraulic resources
and siltation of the San Jacinto reservoir.
Drafting of a computer tool (database and GIS) for the
modelling of erosion and protection propositions. Funding :
Walloon Region of Belgium
2003-2004 : Burkina Faso
Infrastructures and Software Engineer : Diagnosis study
of the infrastructures, analysis and investment proposals for the
development programme of the Centre-Ouest. Inventory of the following
infrastructures : health, training, water supply, irrigation,
agro-pastoralism, roads, tracks.
Development of a database and a GIS. Funding : African Development Bank
2003-2004 : Rwanda
Infrastructures and Software Engineer : Identification
of the existing infrastructures : condition, needs in rehabilitation,
extensions.
Technical studies : hydraulic networks, civil works.
Hydraulic modelling with a specialised technical software and GIS. Funding : World Bank
2003 : Burkina Faso
Project Manager, Databases Engineer : Drafting of a
database for the recording and treatment of data related to the fluids
circulations in the brewery. Funding : BRAKINA
2003 : Djibouti
Project Manager, Computer Engineer : Improvement and
up-date of the database for the monitoring of the demobilization
process (military, police forces, former rebels) after the end of the
civil war.
Financial control of the disbursements, termination of
the previous phases, preparation of the next phases. Funding :
European Union
2002-2003 : Uzbekistan
Project Manager : Identification of the demand,
analysis of the investment programmes, optimisation of the financing,
analysis of the existing infrastructures and evolution propositions in
the view of the privatisation of the water supply services.
Funding : European Bank for Reconstruction and Development
2001-2004 : Belgium
Software Engineer : Coherence of the data, preparation
of the automated encoding forms for funds requests, drafting of
automated import routines for the DAPHNE and Fundamental Rights
Programmes (EU, DG Justice). Funding : European Union
2001-2002 : Rwanda
Data bases and GIS Engineer : Creation and development of a national MIS for the agricultural resources in marshlands.
Creation and development of a MIS for catchment areas protection against erosion. Funding : African Development Bank
2001-2002 : Mali
Hydraulics and Civil Works Engineer : Responsible for
the water supply networks and civil engineering of the project.
Funding : Lux-Development
2001-2002 : Rwanda
Projet manager, Engineer in Hydraulics : Identification
study, final study and tender documents drafting for the water supply
of the Rutongo hospital. Characterisation of the resources,
identification of the beneficiaries, topographic study, technical
studies. Funding : Belgian Technical Co-operation
2001-2002 : Romania
Hydraulics and Civil Works Engineer : Rehabilitation of
the water supply and sanitation facilities and networks in the city of
Sibiu (200 000 inhabitants). Identification, measurement and cost
estimates of the needed rehabilitation works to the networks and
facilities. Funding : European Bank for Reconstruction and
Development
2001 : Burkina Faso
Project Manager : Supervision of the works of 2 new buildings at the Ouagadougou University.
Definition of the methodology, administrative,
technical and financial issues. Follow-up of the activities and
identification of the delays' causes. Proposition of improvements.
Evaluation of the entrepreneur's and architecture company's quality and
capacities. Funding : Belgian Technical Co-operation
2000-2001 : Rwanda
Project manager, Engineer in Hydraulics : Final study
of 4 water supply networks, including a sanitation part.
Characterisation of the resources, identification of the beneficiaries,
networks study (more than 60 km), tender documents, study of the
sanitation condition of the populations and improvement propositions.
GIS application for data processing of field data. Funding : Belgian Technical Co-operation
2000-2001 : Rwanda
Data bases and GIS Engineer : Creation and development
of a software for the operational follow-up of a water supply network :
water treatment plant, pumping stations, network, distribution,
billing, stock management. Operational and accounting follow-up.
Including a GIS module. Funding : KfW
2000-2001 : Morocco
Data bases Engineer : Development of a database for
field surveys. Relations analysis, structure definition, programming,
data processing. Identification of the health factors. Funding :
Walloon Region of Belgium
2000-2001 : Togo
Data bases Engineer : Support to software development :
forms, reports, testing, links with external applications
Funding : European Union
2000-2001 : Togo
Data bases Engineer : Support to software development : tables definition, forms, reports, testing Funding : World Bank
2000 : Rwanda
Project Manager : Water supply in Nyarubuye. Demand :
20 m³/h, characterisation of the resources, identification of the
beneficiaries, networks study, tender documents. Funding : UNHCR
2000 : Cameroon
Software Engineer : Development of a software for
looped networks calculations. Extension of the water supply network for
the city of Soa (Yaounde). Funding : SNEC
2000 : Burkina Faso
Project Manager : Study for the improvement and
extension of the water treatment plant and pumping station of Itengue.
Present production : 90 m³/h, future demand : 290 m³/h.
Analysis and improvement of the existing system, study of a new
treatment plant, including pipelines and pumping station.
Networks study, measurement, cost estimate, tender documents. Funding : ONEA
1999 & 2001 : Belgium
Data bases Engineer : Support to software development :
tables definition, forms, reports, testing Funding : VIPS -
Private funding
1999 : Ivory Coast
Project Manager : Hand-over of the co-operation
activities to a private structure of technical co-operation. Evaluation
of the remaining activities for every project (technical, financial,
respect of the logical framework, etc.) Funding : Belgian
Technical Co-operation
1999 : Burkina Faso
Project Manager : Water supply and sanitation study of Diapaga town (Province of Tapoa).
Demand : 30 m³/h, 22 000 inhabitants, search for boreholes, storage study, water treatment, distribution network, etc.
Computerised processing of the field data. Funding : Walloon Region of Belgium
1999 : Burkina Faso
Infrastructures and Software Engineer : Flows simulations and modelling.
Drafting and calculation of civil works infrastructures. Funding : African Development Bank
1999 : Benin
Team leader : The city of Ouidah has numerous problems
on the path of its development : water supply, sewerage and sanitation,
solid waste management, etc…
The goal of the mission was to identify possible
development projects, that could be submitted to the financing of the
Walloon Region of Belgium Funding : Walloon Region of Belgium
1998-1999 : Belgium
Software Engineer : Computerisation of human resources activities (salaries, curriculum vitae, holidays, etc.).
Development of software's and databases for the management of employees and experts.
Technical software's : water supply, measurement and cost estimates, CAD, etc. Funding : S.H.E.R. Consulting-Engineers
1998-1999 : Belgium
Data bases Engineer : Evaluation of the relations
between Belgian NGOs and their local partners (85 NGOs, 96 partners, 28
countries).
In charge of the automatisation of the fields surveys
into databases, data analysis, production of reports. Funding :
Belgian Co-operation
1998 : Guinea
Project Manager : Water supply of Kouratountou,
Prefecture of Telimele. Final study, topography, hydrogeological study.
Funding : Walloon Region of Belgium
1996-2002 : Togo
Data bases and GIS Engineer : Support to software development : programming and GIS Funding : European Union
1996-1999 : Rwanda
Software Engineer : Drafting and development of a
software for automatisation of calculations, measurements, cost
estimates and tender documents in water supply projects. Funding :
World Bank
1995-1998 : Rwanda
Hydraulics and Civil Works Engineer : 126 km of water
supply networks and catchment of 600 sources in the Musambira,
Nyabikenke and Rutobwe communes (Prefecture of Gitarama). Final studies
(topography, calculations, measurements, cost estimates), drafting and
launching of tenders for procurement and works, selection of
enterprises, works supervision, direct execution of some works.
Funding : World Bank and Swiss Co-operation
1995 : Guinea
Project Manager : Water supply project in the Province
of Telimele. 55 km water networks in the Bende district. Topography,
hydrology, final studies. Measurements, cost estimates, tender
documents. Funding : Government of Guinea
1994 : Burundi
Hydraulics and Civil Works Engineer : Feasibility and
final study, tender documents for the creation of a 45 ha industrial
area in Bujumbura. Roads (4 km), Rainwater networks (9 km), Sewerage
(4.2 km), Water supply (5 km) and electrification. Development of urban
regulations. Funding : French Co-operation
1994 : Burundi
Works supervision Engineer : Improvement and
development of the facilities in the Carama Area, North of Bujumbura,
160 ha, 22000 inhabitants. Drafting of the tender documents. Water
supply, electrification and public lighting works supervision.
Funding : French Co-operation
1993-1994 : Rwanda
Project Manager : Supervision and works management of a
water supply network for the Kanombe military hospital in Kigali.
Funding : Ministry of Defence (Belgium)
1993-1994 : Rwanda
Works supervision Engineer : Supervision and works
management for the construction of a water tank. Belgian Military
Co-operation in Kigali. Funding : Ministry of Defence (Belgium)
1993 : Burundi
Engineer : Feasibility and final studies for the water supply in the Provinces of Bubanza, Cibitoke and Makamba.
Field visit of the networks, inventory of the hydraulic
and sanitation infrastructures, diagnosis of the rehabilitation works.
Funding : Belgian Co-operation
1991-1993 : Burundi
Teacher : Courses : Materials technology, Concrete
technology, Roads and civil works, Metallic construction, Statics,
Topography. Funding : APEFE
Note: Some projects here-above are personal references of Eric VANDEN BORRE
|